We always find a solution
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #

Our work

LLC „Metesta“ provides services of non-destructive testing to energy, oil, chemical, logistics and construction industries within and outside the Europe. Company performs testing at steel structures and pressure vessel factories, construction sites and during shutdowns of refineries, chemical and power plants.

Geography of works include Northern countries – Norway, Sweden, Finland, Bulgaria at south and Benelux at west. The most faraway projects we performed at Martinique and La Réunion.

2004
1 x 15.000 m³, 2 x 10.000 m³ tanks erection, piping, Visaginas
1 x 15.000 m³, 2 x 10.000 m³ tanks erection, piping, Visaginas
1 x 15.000 m³, 2 x 10.000 m³ tanks erection, piping, Visaginas
1 x 15.000 m³, 2 x 10.000 m³ tanks erection, piping, Visaginas

Project:

  • 1 x 15.000 m³, 2 x 10.000 m³ tanks erection, piping.

Services:

  • RT – 900 exposures, UT – 125 m, PT – 50 pipe welds, MT – 90 pipe welds, LT – 1700 m.

Place, project start – finish:

  • Visaginas, Lithuania;
  • 2004 October – 2005 September.
1 x 5.000 m3 tanks erection, Klaipėda
1 x 5.000 m3 tanks erection, Klaipėda
1 x 5.000 m3 tanks erection, Klaipėda
1 x 5.000 m3 tanks erection, Klaipėda

Project:

  • 1 x 5.000 m³ tanks erection.

Services:

  • RT – 140 exposures, MT – 250 m, PT – 80 pipe welds, LT – 340 m.

Place, project start – finish:

  • Klaipėda, Lithuania;
  • 2004 November – 2005 February.
2005
3 x 20.000 m3, 3 x 14.000 m3, 4 x 5.000 m3 tanks erection, pipeline, Klaipėda
3 x 20.000 m3, 3 x 14.000 m3, 4 x 5.000 m3 tanks erection, pipeline, Klaipėda
3 x 20.000 m3, 3 x 14.000 m3, 4 x 5.000 m3 tanks erection, pipeline, Klaipėda
3 x 20.000 m3, 3 x 14.000 m3, 4 x 5.000 m3 tanks erection, pipeline, Klaipėda

Project:

  • 3 x 20.000 m³, 3 x 14.000 m³, 4 x 5.000 m³ tanks erection, pipeline.

Services:

  • RT – 1950 exposures, PT – 710 m, MT – 2050 m,  LT – 7000 m.

Place, project start – finish:

  • Klaipėda, Lithuania;
  • 2005 February – 2006 April.
1 x 30.000 m3 tank erection, pipeline, Klaipėda
1 x 30.000 m3 tank erection, pipeline, Klaipėda
1 x 30.000 m3 tank erection, pipeline, Klaipėda
1 x 30.000 m3 tank erection, pipeline, Klaipėda

Project:

  • 1 x 5.000 m³ tanks erection.

Services:

  • RT – 520 exposures, PT – 240 m, LT – 1250 m.

Place, project start – finish:

  • Klaipėda, Lithuania;
  • 2005 May – 2005 December.
1 x 15.000 m3 ammonia storage, steel structures, pipeline, Jonava
1 x 15.000 m3 ammonia storage, steel structures, pipeline, Jonava
1 x 15.000 m3 ammonia storage, steel structures, pipeline, Jonava
1 x 15.000 m3 ammonia storage, steel structures, pipeline, Jonava

Project:

  • 1 x 15.000 m³ ammonia storage, steel structures, pipeline.

Services:

  • RT – 2400 exposures, PT – 3200 m, MT – 1250 m, LT – 2800 m.

Place, project start – finish:

  • Jonava, Lithuania;
  • 2006 November – 2005 June.
1 x 2.500 m3 tank erection, Klaipėda
1 x 2.500 m3 tank erection, Klaipėda
1 x 2.500 m3 tank erection, Klaipėda
1 x 2.500 m3 tank erection, Klaipėda

Project:

  • 1 x 5.000 m³ tanks erection.

Services:

  • RT – 135 exposures, PT – 127 m, LT – 105 m.

Place, project start – finish:

  • Klaipėda, Lithuania;
  • 2005 August – 2005 November.
2006
3 x 5.000 m3 tank erection, Fertigent BVBA, Gent
3 x 5.000 m3 tank erection, Fertigent BVBA, Gent
3 x 5.000 m3 tank erection, Fertigent BVBA, Gent
3 x 5.000 m3 tank erection, Fertigent BVBA, Gent

Project:

  • 3 x 5.000 m³ tank erection.

Services:

  • RT – 635 exposures  PT – 420 m, LT – 380 m.

Place, project start – finish:

  • Fertigent BVBA, Gent, Belgium;
  • 2006 January – 2006 May.
FOSTER  WHEELER IBERIA S.A. FCC GASOLINE SHU PROJECT at refinery, Mažeikiai
FOSTER WHEELER IBERIA S.A. FCC GASOLINE SHU PROJECT at refinery, Mažeikiai
FOSTER  WHEELER IBERIA S.A. FCC GASOLINE SHU PROJECT at refinery, Mažeikiai
FOSTER WHEELER IBERIA S.A. FCC GASOLINE SHU PROJECT at refinery, Mažeikiai

Project:

  • FOSTER  WHEELER IBERIA S.A. FCC GASOLINE SHU PROJECT at refinery.

Services:

  • RT – 450 exposures, PT – 215 pipe welds, MT – 90 pipe welds.

Place, project start – finish:

  • Mažeikiai, Lithuania;
  • 2006 May – 2006 December.
NDT of refinery technological equipment and pipelines, Mažeikiai
NDT of refinery technological equipment and pipelines, Mažeikiai
NDT of refinery technological equipment and pipelines, Mažeikiai
NDT of refinery technological equipment and pipelines, Mažeikiai

Project:

  • NDT of refinery technological equipment and pipelines.

Services:

  • RT – 2600 exposures, PT – 290 pipe welds, LT – 9000 m²,  UT thickness measurements – 19000 pcs.

Place, project start – finish:

  • Mažeikiai, Lithuania;
  • 2006 June – 2006 November.
Turnover of  KR-101, LK-2 unit at refinery, Mažeikiai
Turnover of KR-101, LK-2 unit at refinery, Mažeikiai
Turnover of  KR-101, LK-2 unit at refinery, Mažeikiai
Turnover of KR-101, LK-2 unit at refinery, Mažeikiai

Project:

  • Turnover of  KR-101, LK-2 unit at refinery.

Services:

  • RRT – 900 exposures, PT – 180 pipe welds, PMI – 400 pcs.

Place, project start – finish:

  • Mažeikiai, Lithuania;
  • 2006 June – 2006 September.
2007
NDT and diagnostics of refinery  technological equipment and pipelines, Mažeikiai
NDT and diagnostics of refinery technological equipment and pipelines, Mažeikiai
NDT and diagnostics of refinery  technological equipment and pipelines, Mažeikiai
NDT and diagnostics of refinery technological equipment and pipelines, Mažeikiai

Project:

  • NDT and diagnostics of refinery technological equipment and pipelines.

Services:

  • UT thickness measurements – 180000 pcs, gamma ray thickness measurements – 2600 exposures.

Place, project start – finish:

  • Mažeikiai, Lithuania;
  • 2007 February – 2008 March.
Turnaround 2007, Visbreaking unit at refinery, Mažeikiai
Turnaround 2007, Visbreaking unit at refinery, Mažeikiai
Turnaround 2007, Visbreaking unit at refinery, Mažeikiai
Turnaround 2007, Visbreaking unit at refinery, Mažeikiai

Project:

  • Turnaround 2007, Visbreaking unit at refinery.

Services:

  • NDT all methods; PWHT; totally 22000 hours worked.

Place, project start – finish:

  • Mažeikiai, Lithuania;
  • 2007 July – 2008 February.
2008
NDT and diagnostic of refinery technological equipment and pipelines. Turnaround 2008. Mažeikiai
NDT and diagnostic of refinery technological equipment and pipelines. Turnaround 2008. Mažeikiai
NDT and diagnostic of refinery technological equipment and pipelines. Turnaround 2008. Mažeikiai
NDT and diagnostic of refinery technological equipment and pipelines. Turnaround 2008. Mažeikiai

Project:

  • NDT and diagnostic of refinery technological equipment and pipelines. Turnaround 2008. New hydrogen unit.

Services:

  • UT thickness measurements – 220000 pcs., gamma ray thickness measurements – 2900 pcs. RT – 3800 exp., UT – 300 pipe welds. PT – 550 pcs., MT – 1100 m, PMI – 2600 pcs, HT – 1300 pcs., PWHT – 300 pipe welds.
Tan2 x 20.000 m3 1 x 5.000 m3 tanks erection, Gdansk
Tan2 x 20.000 m3 1 x 5.000 m3 tanks erection, Gdansk
Tan2 x 20.000 m3 1 x 5.000 m3 tanks erection, Gdansk
Tan2 x 20.000 m3 1 x 5.000 m3 tanks erection, Gdansk

Project:

  • 2 x 20.000 m³ 1 x 5.000 m³ tanks erection.

Services:

  • UT – 1020 m, PT – 2900 m, LT – 2400 m.

Place, project start – finish:

  • Gdansk, Poland;
  • September 2008 – February 2009.
Bridge over Nevežis, Plungė
Bridge over Nevežis, Plungė
Bridge over Nevežis, Plungė
Bridge over Nevežis, Plungė

Project:

  • Bridge over Nevežis.

Services:

  • UT – 600 m, MT – 1200 m.

Place, project start – finish:

  • Plungė, Lithuania;
  • 2008 October – 2009 April.
2009
Railway bridge, Plungė
Railway bridge, Plungė
Railway bridge, Plungė
Railway bridge, Plungė

Project:

  • Railway bridge.

Services:

  • UT – 300 m, MT – 400 m.

Place, project start – finish:

  • Plungė, Lithuania;
  • January 2009 – May 2009.
Turnaround 2009; Pipeline diagnostics, thickness measurements of refinery pressure vessels and pipelines, Mažeikiai
Turnaround 2009; Pipeline diagnostics, thickness measurements of refinery pressure vessels and pipelines, Mažeikiai
Turnaround 2009; Pipeline diagnostics, thickness measurements of refinery pressure vessels and pipelines, Mažeikiai
Turnaround 2009; Pipeline diagnostics, thickness measurements of refinery pressure vessels and pipelines, Mažeikiai

Project:

  • Turnaround 2009; Pipeline diagnostics, thickness measurements of refinery pressure vessels and pipelines.

Services:

  • RT – 2200 expositions, UT – 670 pipe welds, MT – 320 pipe welds, PT – 600 pipe welds, HT – 2000, PMI – 700, PWHT – 660 pipe welds, UT thickness measurements – 20000
7 x 20.000 m3 ; 50.000 m3 tanks erection, Polikarishe and Sliven
7 x 20.000 m3 ; 50.000 m3 tanks erection, Polikarishe and Sliven
7 x 20.000 m3 ; 50.000 m3 tanks erection, Polikarishe and Sliven
7 x 20.000 m3 ; 50.000 m3 tanks erection, Polikarishe and Sliven

Project:

  • 7 x 20.000 m³; 50.000 m³ tanks erection.

Services:

  • VT – 8500 m, MT – 2200 m, UT – 580 m, PT – 4750 m, LT – 9700 m.

Place, project start – finish:

  • Polikarishe and Sliven, Bulgaria;
  • April 2009 – April 2010.
Pipelines installation at refinery, Kralupy
Pipelines installation at refinery, Kralupy
Pipelines installation at refinery, Kralupy
Pipelines installation at refinery, Kralupy

Project:

  • Pipelines installation at refinery.

Services:

  • RT – 5300 exposures.

Place, project start – finish:

  • Kralupy, Czech Republic;
  • June 2009 – October 2009.
4 x 40.000 m3 tanks erection, Rotterdam
4 x 40.000 m3 tanks erection, Rotterdam
4 x 40.000 m3 tanks erection, Rotterdam
4 x 40.000 m3 tanks erection, Rotterdam

Project:

  • 4 x 40.000 m³ tanks erection.

Services:

  • UT – 680 m, MT – 2000 m,  PT – 250 m,  LT – 4500 m.

Place, project start – finish:

  • Rotterdam, The Netherlands;
  • September 2009 – December 2011.
2010
Bridge over river Venta at Ventspils, Plungė
Bridge over river Venta at Ventspils, Plungė
Bridge over river Venta at Ventspils, Plungė
Bridge over river Venta at Ventspils, Plungė

Project:

  • Bridge over river Venta at Ventspils.

Services:

  • UT – 490 m, MT – 200 m.

Place, project start – finish:

  • Plungė, Lithuania;
  • March 2010 – July 2010.
NDT of potentially dangerous technological equipment and pipelines at refinery, Mažeikiai
NDT of potentially dangerous technological equipment and pipelines at refinery, Mažeikiai
NDT of potentially dangerous technological equipment and pipelines at refinery, Mažeikiai
NDT of potentially dangerous technological equipment and pipelines at refinery, Mažeikiai

Project:

  • NDT of potentially dangerous technological equipment and pipelines at refinery.

Services:

  • RT, UT, MT, PT, VT, PMI, HT, PWHT, Ultrasonic and gamma ray thickness measurements – 10000 hour worked out.
6 x 40.000 m3 tanks erection, Gent
6 x 40.000 m3 tanks erection, Gent
6 x 40.000 m3 tanks erection, Gent
6 x 40.000 m3 tanks erection, Gent

Project:

  • 6 x 40.000 m³ tanks erection.

Services:

  • UT – 860 m. MT – 3100 m, PT – 400, LT – 7000 m.

Place, project start – finish:

  • Gent, Belgium;
  • October 2009 – August 2011.
PEI Centrale Port Est (Storage and process tanks,  19 pcs), Port Est
PEI Centrale Port Est (Storage and process tanks, 19 pcs), Port Est
PEI Centrale Port Est (Storage and process tanks,  19 pcs), Port Est
PEI Centrale Port Est (Storage and process tanks, 19 pcs), Port Est

Project:

  • PEI Centrale Port Est (Storage and process tanks, 19 pcs).

Services:

  • PT – 5800 m., LT – 5200 m, UT – 80 m.

Place, project start – finish:

  • Port Est, La Reunion;
  • September 2010 – August  2011.
5 x 32.000 m3 tanks erection, Vlissingen
5 x 32.000 m3 tanks erection, Vlissingen
5 x 32.000 m3 tanks erection, Vlissingen
5 x 32.000 m3 tanks erection, Vlissingen

Project:

  • 5 x 32.000 m³ tanks erection.

Services:

  • MT – 1860 m, UT – 420 m, PT – 180 m, LT – 6000 m.

Place, project start – finish:

  • Vlissingen, The Netherlands;
  • October 2010 – December 2011.
2011
Turnaround of refinery 2011, Mažeikiai
Turnaround of refinery 2011, Mažeikiai
Turnaround of refinery 2011, Mažeikiai
Turnaround of refinery 2011, Mažeikiai

Project:

  • Turnaround of refinery 2011.

Services:

  • RT – 1800 expositions, UT – 600 pipe welds, MT – 500 pipe welds, PT – 600 pipe welds, HT – 2800, PMI – 400.

Place, project start – finish:

  • Mažeikiai, Lithuania;
  • March 2013 – May 2013.
2 x 40.000 m³, 7 x 25.000 m³,  5 x 10.000 m³, 2 x 6.000 m³ tanks erection, Thernauzen
2 x 40.000 m³, 7 x 25.000 m³, 5 x 10.000 m³, 2 x 6.000 m³ tanks erection, Thernauzen
2 x 40.000 m³, 7 x 25.000 m³,  5 x 10.000 m³, 2 x 6.000 m³ tanks erection, Thernauzen
2 x 40.000 m³, 7 x 25.000 m³, 5 x 10.000 m³, 2 x 6.000 m³ tanks erection, Thernauzen

Project:

  • 2x40.000 m³, 7x25.000 m³,  5x10.000 m³, 2x 6.000 m³ tanks erection.

Services:

  • VT – 12000 m, UT – 480 m, PT/MT – 180 m, LT – 7000 m.

Place, project start – finish:

  • Thernauzen, The Netherlands;
  • May 2011 – December 2011.
PEI Centrale Bellefontaine
PEI Centrale Bellefontaine
PEI Centrale Bellefontaine
PEI Centrale Bellefontaine

Project:

  • PEI Centrale Bellefontaine (Storage and process tanks, 19 pcs).

Services:

  • MT – 290 m, PT – 4900 m, LT – 4500 m.

Place, project start – finish:

  • Bellefontaine, Martinique;
  • May 2011 – July 2013.
440 MW Power Plant, CCPP, Elektrėnai
440 MW Power Plant, CCPP, Elektrėnai
440 MW Power Plant, CCPP, Elektrėnai
440 MW Power Plant, CCPP, Elektrėnai

Project:

  • 440 MW Power Plant, CCPP.

Services:

  • RT – 1200 exp., MT/PT – 80 pipe welds,  UT – 100 pipe welds.

Place, project start – finish:

  • Elektrėnai, Lithuania;
  • June 2011 – January 2012.
2012
Klaipėda Waste to Heat plant
Klaipėda Waste to Heat plant
Klaipėda Waste to Heat plant
Klaipėda Waste to Heat plant

Project:

  • Klaipėda Waste to Heat plant.

Services:

  • RT – 6660 exp., UT – 175 pipe welds, MT/PT – 550 pipe welds.

Place, project start – finish:

  • Klaipėda, Lithunia;
  • November 2011 – February 2013.
Turnaround of refinery 2012, Mažeikiai
Turnaround of refinery 2012, Mažeikiai
Turnaround of refinery 2012, Mažeikiai
Turnaround of refinery 2012, Mažeikiai

Project:

  • Turnaround of refinery 2012.

Services:

  • RT – 7000 exp., UT – 850 pipe welds, MT – 1500 pipe welds, PT – 1400 pipe welds,  PMI – 8900 pcs., HT – 17000 pcs., PWHT – 240 pipe welds.

Place, project start – finish:

  • Mažeikiai, Lithuania;
  • March 2013 – May 2013.
Gas pipeline DN 400 (33 km), Jurbarkas - Tauragė
Gas pipeline DN 400 (33 km), Jurbarkas - Tauragė
Gas pipeline DN 400 (33 km), Jurbarkas - Tauragė
Gas pipeline DN 400 (33 km), Jurbarkas - Tauragė

Project:

  • Gas pipeline DN 400 (33 km).

Services:

  • RT – 3400 panoramic expositions.

Place, project start – finish:

  • Jurbarkas – Tauragė, Lithuania;
  • April 2012 – October 2012.
Kluizendok tank park expansion 6 x 40.000 m3 tanks, Gent
Kluizendok tank park expansion 6 x 40.000 m3 tanks, Gent
Kluizendok tank park expansion 6 x 40.000 m3 tanks, Gent
Kluizendok tank park expansion 6 x 40.000 m3 tanks, Gent

Project:

  • Kluizendok tank park expansion 6 x 40.000 m³ tanks.

Services:

  • UT – 650 m,  RT – 140 m, PT/MT – 7200 m., LT – 12600 m.

Place, project start – finish:

  • Gent, Belgium;
  • May 2012 – August 2013.
2013
Biofuel  fired CHP, Jelgava
Biofuel fired CHP, Jelgava
Biofuel  fired CHP, Jelgava
Biofuel fired CHP, Jelgava

Project:

  • Biofuel  fired CHP.

Services:

  • RT – 2400 exp.; UT; MT; PT.

Place, project start – finish:

  • Jelgava, Latvia;
  • November 2012 – May 2013.
Eidfjord suspension bridge
Eidfjord suspension bridge
Eidfjord suspension bridge
Eidfjord suspension bridge

Project:

  • Eidfjord suspension bridge.

Services:

  • RT – 1200 exp. (600 m), UT – 900 m, MT/PT – 4100 m, VT – 100%.

Place, project start – finish:

  • Eidfjord, Norway;
  • November 2012 – April 2013.
NDT of technological equipment and pipelines, Mažeikiai
NDT of technological equipment and pipelines, Mažeikiai
NDT of technological equipment and pipelines, Mažeikiai
NDT of technological equipment and pipelines, Mažeikiai

Project:

  • NDT of technological equipment and pipelines.

Services:

  • RT, UT, MT, PT, VT, LT, PMI, HT, PWHT, ultrasonic and gamma ray thickness measurements.

Place, project start – finish:

  • Mažeikiai, Lithuania;
  • June 2013 – June 2016 (estimated).
Dale suspension bridge
Dale suspension bridge
Dale suspension bridge
Dale suspension bridge

Project:

  • Dale suspension bridge.

Services:

  • RT – 700 m, UT – 80, MT – 600 m.

Place, project start – finish:

  • Dale, Norway;
  • June 2013 – August 2013.
Gas pipeline DN 700 (18 km), Klaipėda
Gas pipeline DN 700 (18 km), Klaipėda
Gas pipeline DN 700 (18 km), Klaipėda
Gas pipeline DN 700 (18 km), Klaipėda

Project:

  • Gas pipeline DN 700 (18 km).

Services:

  • RT – 1050 (panoramic) DN 700 pipe welds RT – 1400 (frontal) different diameters pipe welds , UT – 450 DN 700 pipe welds; VT − 100%.

Place, project start – finish:

  • Klaipėda, Lithuania;
  • August 2013 – November 2014.
Gas pipeline DN 400 (100 km), Tauragė - Klaipėda
Gas pipeline DN 400 (100 km), Tauragė - Klaipėda
Gas pipeline DN 400 (100 km), Tauragė - Klaipėda
Gas pipeline DN 400 (100 km), Tauragė - Klaipėda

Project:

  • Gas pipeline DN 400 (100 km).

Services:

  • RT – 8000 (panoramic) DN 400 pipe welds, RT – 1200 (frontal) different diameters pipe welds.

Place, project start – finish:

  • Tauragė – Klaipėda, Lithuania;
  • September 2012 – October 2013.
2014
300 MW  FF Power plant, Narva
300 MW FF Power plant, Narva
300 MW  FF Power plant, Narva
300 MW FF Power plant, Narva

Project:

  • 300 MW  FF Power plant.

Services:

  • RT – 2500 pipes welds exposition.

Place, project start – finish:

  • Narva, Estonia;
  • January 2014 – July 2014.
Waste to Energy plant, Linköping
Waste to Energy plant, Linköping
Waste to Energy plant, Linköping
Waste to Energy plant, Linköping

Project:

  • Waste to Energy plant.

Services:

  • RT - 6000 exposures,  MT - 500 welds + 1000 m, PT, PMI, HT, VT, PWHT.

Place, project start – finish:

  • Linköping, Sweden;
  • August 2014 – July   2015
Waste to Energy plant, Tampere
Waste to Energy plant, Tampere
Waste to Energy plant, Tampere
Waste to Energy plant, Tampere

Project:

  • Waste to Energy plant.

Services:

  • RT, UT, MT, PT, PMI, HT, VT, PWHT.

Place, project started – finished:

  • Tampere, Finland;
  • October 2014 – May 2015
2015
ORLEN Lietuva, Mažeikiai
ORLEN Lietuva, Mažeikiai
ORLEN Lietuva, Mažeikiai
ORLEN Lietuva, Mažeikiai

Project:

  • NDT of technological equipment and pipelines.

Services:

  • RT, UT, MT, PT, VT, LT, PMI, HT, PWHT, ultrasonic and gamma ray thickness measurements.

Place, project start – finish:

  • Mažeikiai, Lithuania;
  • January 2015 – December 2015
ORLEN Leituva, GP - 3, Mažeikiai
ORLEN Leituva, GP - 3, Mažeikiai
ORLEN Leituva, GP - 3, Mažeikiai
ORLEN Leituva, GP - 3, Mažeikiai

Project:

  • Turnover of  GP-3 unit at refinery.

Services:

  • RT – 4000 exposures, PT/MT – 800 pipe welds, PMI – 1700 pcs., HT - 8000 pcs.

Place, project start – finish:

  • Mažeikiai, Lithuania;
  • January 2015 - March 2015.
JBIK, Mažeikiai - Porvoo
JBIK, Mažeikiai - Porvoo
JBIK, Mažeikiai - Porvoo
JBIK, Mažeikiai - Porvoo

Project:

  • JBIK project in a chemical plant.

Services:

  • RT – 200 exposures, MT – 20 pipe welds, HT – 300 pcs., PWHT - 750 pipe welds.

Place, project start – finish:

  • Mažeikiai, Lithuania - Porvoo, Finland
  • May 2015 - October 2015.
Elme Messer Gass, Riga
Elme Messer Gass, Riga
Elme Messer Gass, Riga
Elme Messer Gass, Riga

Project:

  • Elme Messer Gaas

Services:

  • RT – 3000 exposition

Place, project start – finish:

  • Riga, Latvia;
  • June 2015 – September 2015.
EGE Shutdown 2015, Oslo
EGE Shutdown 2015, Oslo
EGE Shutdown 2015, Oslo
EGE Shutdown 2015, Oslo

Project:

  • EGE Shutdown 2015

Services:

  • RT – 500 exposures, MT – 100 welds.

Place, project start – finish:

  • Oslo, Norway;
  • June 2015 −  September 2015.
2016
2017
2018
2019
2020